- RO, WWT, DWT, FWT systems:
2018-present time. Cargo, Navy fleet, cruise ships, superyachts, offshore oil rigs.
Retrofit installation of wastewater treatment systems. Final assembling and commissioning of fresh water, waste water, food waste treatment systems. Service and troubleshooting.
- BOILER ROOM/STEAMSHOP EQUIPMENT INSTALLATION:
2017-2020.
Retrofit installation, service of boiling equipment in Finland and Sweden.
- RO PLANT RETROFIT INSTALLATION:
2018 (Los Angeles, USA), M/V Carnival Splendor.
On-site retrofit installation of 600 m3/day Reverse Osmosis plant.
- MEMBRANE WASTEWATER TREATMENT PLANTS MODERNIZATION:
2016 (Philadelphia, PA USA), (San Diego, CA USA), (Jacksonville, FL USA), (Baumont, TX USA). Total 19 chemical tankers with 50.000 t (dw).
Control cabinets, pumps and plastic pipes replacement (upgrade) to USCG norms compliance.
- 76 M3/H REVERSE OSMOSIS PLANTS COMMISSIONING MAINTENANCE:
2016 (Norwegian Sea), M/V Genting Dream.
Mechanical support during reverse osmosis plants (4 pcs) commissioning.
- REVERSE OSMOSIS PLANTS MONTAGE AND CABLING:
2016 (Papenburg, Germany), M/V Genting Dream.
Installation of total 4 pcs 76 m3/h ROTP plants. Final assembling and commissioning.
- MEMBRANE BIOREACTOR UNIT ASSEMBLING:
2015 (Genoa, Italy), M/V Seven Seas Explorer.
On-site full assembling (components installation, inside/outside piping, wiring) of 2 pcs ~90m3/day MEMBRANE BIOREACTOR units equipped with screening unit.