PORTFOLIO

 
  • RO, WWT, DWT, FWT systems:

2018-present time. Cargo, Navy fleet, cruise ships, superyachts, offshore oil rigs.

​Retrofit installation of wastewater treatment systems. Final assembling and commissioning of fresh water, waste water, food waste treatment systems. Service and troubleshooting.

 

  • BOILER ROOM/STEAMSHOP EQUIPMENT INSTALLATION:

2017-2020. 

​Retrofit installation, service of boiling equipment in Finland and Sweden.

 

  • RO PLANT RETROFIT INSTALLATION:

2018 (Los Angeles, USA), M/V Carnival Splendor.

​On-site retrofit installation of 600 m3/day Reverse Osmosis plant.

 

  • MEMBRANE WASTEWATER TREATMENT PLANTS MODERNIZATION:

2016 (Philadelphia, PA USA), (San Diego, CA USA), (Jacksonville, FL USA), (Baumont, TX USA). Total 19 chemical tankers with 50.000 t (dw).

Control cabinets, pumps and plastic pipes replacement (upgrade) to USCG norms compliance.

 

  • 76 M3/H REVERSE OSMOSIS PLANTS COMMISSIONING MAINTENANCE:

2016 (Norwegian Sea), M/V Genting Dream.

Mechanical support during reverse osmosis plants (4 pcs) commissioning. 

 

  • REVERSE OSMOSIS PLANTS MONTAGE AND CABLING:

2016 (Papenburg, Germany), M/V Genting Dream.

Installation of total 4 pcs 76 m3/h ROTP plants. Final assembling and commissioning.

 

  • MEMBRANE BIOREACTOR UNIT ASSEMBLING:

2015 (Genoa, Italy), M/V Seven Seas Explorer.

On-site full assembling (components installation, inside/outside piping, wiring) of 2 pcs ~90m3/day MEMBRANE BIOREACTOR units equipped with screening unit.